Aberdeen Hospital

Public Building (Hospital)

We worked closely with the main contractor and the client’s engineer throughout the building regulation stage to deliver construction issue drawings early on.

We were asked to undertake the design and detail of the post-tensioned floors for the New Emergency Care Centre at Aberdeen hospital.

In particular, the development consisted of an 8 storey structure using 300mm post-tensioned slabs on a 7.5m grid. Each slab was recessed to accommodate flush fitted wash room pods.

This enabled the client to make decisions quickly and allowed development work to begin on site within schedule.

CIMG2582 – Resized
CIMG2604 – Resized
CIMG2605 – Resized
File No 33 – Resized
PA270013 – Resized

Key Facts

  • Client: Robertson Construction, NHS Grampian
  • Location: Aberdeen
  • Year: 2012
  • Summary:
    We worked alongside NHS Grampian and Robertson Construction to develop a New Emergency Care Centre for Aberdeen Hospital.

Key Contact

Full Profile